Diagram of Gas Well
Diagram of Gas Well
The area of northcentral Pennsylvania traversed by the Loyalsock Trail is underlain by a number of geologic strata containing natural gas, the most well known being the Marcellus shale.  Beneath the LT this shale lies at a depth of 6,000 to 8,000 feet and is up to 200 feet thick.  Natural gas is recovered from the Marcellus shale by means of horizontally drilled wells and the controversial process known as hydraulic fracturing whereby water, sand and chemicals are injected under high pressure into the horizontal wellbore to fracture the shale and release the gas.  The gas is then transported via pipelines to its final use (home heating, generation of electricity, industrial processes, etc.)

Map of Loyalsock State Forest
Map of Loyalsock State Forest
Some of the land, both State Forest land and privately owned land over which hikers on the LT walk has been, or will be, leased for exploration and extraction of natural gas.  On the map, State Forest land that has been leased is shown in light blue.  Although drilling for natural gas will probably occur in that area, the Bureau of Forestry has designated a buffer to minimize disturbance to the LT.  In the area of State Forest land shown in dark blue the gas is privately owned and the Bureau of Forestry has minimal control over gas extraction activities.  The natural gas on much of the privately owned land along the LT has also been leased.

LT hikers may see some activities associated with gas exploration and extraction —

Flagging for Seismic Survey
Flagging for Seismic Survey
Seismic surveys entail placing sources and receivers to send and receive vibrations in order to detect subsurface geologic features.  Plastic flagging, stakes and equipment may be seen along the LT, but they are typically left in place for only a few weeks.

Reconstructed Road
Reconstructed Road
Some existing roads will be widened to accommodate the oversized and heavy equipment used in construction of wellpads, drilling of wells and installation of pipelines.  This is a section of the Genesee Trail (LT mile 19.48 to mile 19.65) that was reconstructed in late 2010 to access a new gas well on private land.

Wellpad Along LT
Wellpad Along LT
Where the natural gas is privately owned there may be wellpads near the LT.  One is adjacent to the LT on private land along the Genesee Trail, shown in the photo, with the LT on the left and the raised edge of the wellpad visible on the right.  These wellpads will probably remain open for an extended period of time.

Drilling a Gas Well
Drilling a Gas Well
Depending on the operator, it takes from four to six weeks to drill a gas well and several more weeks to complete the fracturing operation, after which most of the equipment is removed.  Additional wells may be drilled from the same wellpad in the future.

Construction of Pipeline
Construction of Pipeline
Perhaps the most noticeable impact from gas extraction will be the transportation pipelines, some of which may parallel roads or cross the LT.  The pipelines will be most obvious during construction.

Revegetated Pipeline
Revegetated Pipeline
When they are revegetated they will offer different views and wildlife habitat.